TCT provided cost estimating services for the design and complete construction of PS 316Q, a new 67,000 SF school in Queens. Work included: Incoming domestic/combined water main; concrete curbs at gas meter enclosure; anti-vibration isolation floor system at Second Floor above Gymatorium, bulletin boards at corridors; rolled linoleum, lockers; single-tier, science rooms (fume hoods, plant study centers, lab tables, demo tables, lab carts, drying ovens and ice makers) and all necessary HVAC and plumbing systems.